The money trail

Poor safety in Karachi is often blamed on oversight, but in the fire department’s case, it is also a symptom of cost-cutting, or worse, the creative diversion of funds. As recently as the 2024-25 financial year, audits from its ledgers provide ample damnation.

In one instance, the Auditor General of Pakistan found that Rs33 million was paid out for vehicle repairs, but the work was not authenticated with original vouchers, daily work orders or logbooks.
In earlier years (from 2020-21 and 2023-24), KMC didn’t ensure mandatory five-year fire and building safety inspections. Other discrepancies speak to sheer neglect, such as KMC forgetting for three years to register 55 fire vehicles sent as a gift from the federal government, in violation of its own Sindh Motor Vehicles Ordinance, 1965.

The Auditor General’s office was cognisant of the significant operational challenges KMC’s fire brigade wing faces in the shape of sprawling urbanisation, ageing infrastructure, and high vulnerability to disasters. These factors notwithstanding, the AGP’s findings suggest that the state is effectively feeding the city’s decay by ignoring how critical safety budgets are mismanaged.

Excerpt from the Audit Report on the accounts of Climate Change, Environment and Disaster Management Organisations of Government of Sindh (Audit Year 2024-25)

Half the frustration is that people wondered why nothing had changed since the terrible lessons learned from the 2012 Baldia factory fire, in which more than 250 people were killed. After Gul Plaza, people working and living in high-rise buildings across the city started wondering where their fire escapes were located. An employee of a commercial bank on I. I. Chundrigar Road said they were worried that their office had not held any fire drills after Gul Plaza.

It is not much better in the neighbourhoods, with the 38-year-old resident of an apartment building in North Nazimabad saying all they received was an SBCA warning to comply with fire regulations in three days. “Our building has only one staircase, and two lifts, one of which has not been working for more than two years,” he said. “When the 11-storey apartment was built on a 2,000 square yard plot without a proper fire exit, where was the SBCA?” Builders build for profit, so they compromise on safety, he added. A building can be structurally sound, but it can still be a death trap.

If the people of Karachi were wondering what had been going on, the Sindh High Court outright asked how the SBCA had been doing business for the last forty years. Turns out it had not written the actual Rule book for buildings (as Section 21 of the Sindh Building Control Ordinance, 1979 insists). Instead, the SBCA has relied on the lesser powerful instrument of Regulations. To the court, this effectively meant that many buildings were given the green light “without lawful sanction”. The city’s Master Plan gathered dust on the tenth floor of Civic Centre while its skyline shot up with deathtraps.

“No regulator in the world allows 20 per cent violations in bylaws, but the SBCA does,” said an architect who did not want to be named, as it carries the risk of jeopardising drawings that need approvals. In fact, the builders are just as much to blame. They work with the architect and pay just 60 per cent of the fee until they receive the SBCA approvals. “Once they have the approvals, they forget about the architect and the submission drawings,” he added. “If an architect is principled, they would withdraw their approval. This forces the builder to [look for] some other architect willing to stamp without even a look at the submissions.”

This is why it is said that a stamp mafia is the dark underbelly of Karachi’s building and construction sector. It is alleged by many associated with the built environment, including some researchers and civil society activists, that very few buildings, commercial or residential, are built according to their submission plans. Many are not fire safe. These independent voices hold the city’s regulators responsible, along with Sindh’s legislators, as builders pay off this entire layer of elite to keep this system intact.

It is not difficult to speculate that this was the case with Gul Plaza. And indeed, some digging proves it.

At Partition, the land where the shopping plaza was built was originally an amenity plot for a KMC tram depot. But then the city government converted Plot No. 32-PR-1, Preedy Quarters, Saddar Town into a commercial site, thereby dispossessing the public of its right to a safe environment just so it could grease the wheels of capital accumulation for builders and traders alike. By the 1980s, Gul Plaza rose up with a plan for 1,021 shops on the ground, first and second floors with parking in the basement. In 1998, another floor, parking on the roof and 179 shops in the basement were crammed in.

Over time, the shop owners built wooden storage lofts so they didn’t have to keep ferrying stock from warehouses outside. The corridors and exits narrowed as displays bulged into them. Gul Plaza was, after all, the city’s most popular home store. This gradual erosion of safety features was codified under the guise of “meeting commercial demand,” according to the court documents. And by 2003, the SBCA was only too happy to certify that the building complied with all its rules and bylaws.

It did this even though the lofts alone degraded the building squarely to the most dangerous Type V (combustible) category. Type V structures that exceed basic height and area limits are often not permitted for high-density commercial use. The SBCA’s Technical Committee on Dangerous Buildings notes: “The entire building was occupied by various categories and types of shops and godowns in different sizes with display and storage of all household saleable goods and items, right from imported and local top quality products in plastic, wood, glass, leather, metal, marble, stone, rubber, fibre glass, PVC, foam, paper, hard and soft boards to cloth and carpet rugs, artificial plants/flowers, crockery and cutlery, electronic household machinery, etc. Mostly, they are combustible. Thus, it provides a soft media (for) fire to spread.”

For buildings like these, you are supposed to use fire-resistant construction materials, protect escape routes, install standpipes, and automated suppression systems if you want to follow the Pakistan Fire Safety Provisions 2016 developed by the Pakistan Engineering Council and the National Disaster Management Authority.

Thus, a building that received the SBCA’s completion certificate, but did not have a valid fire safety NOC from KMC lands in a regulatory grey zone. This informalisation of its existence spurs its disposability. This is why the SBCA must be legally barred from issuing completion certificates or any regularising documents, permanent or ad-hoc, if a KMC fire safety NOC is missing.